1.HIGHWAY

  • 해외프로젝트 이미지

Click the image to see the original size.

Project
Detailed Design (Upper Structure) of the Ile-Cuamba Road Bridge Construction Work in Mozambique
Client
JICA(CHODAI)
Date
Feb. 2013 ~ May.2013
Description
  • ​Bridge type
  •   - Post-tensioning T-girder bridge   - RC hollow slab bridge
  • Span size 
  • Width
    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Detailed Design and Construction Supervision of the National Road No. 3 Improvement Project in Cambodia
    Client
    MPWT, Cambodia(Funded by EDCF)
    Date
    Oct. 2007~ Mar.2011
    Description
  • ​Bridge type
  •   - RC SLAB, PSC deck bridge
  • Span size
  •   - 12.5+15+12.5=40m
         (Daeum Trang) and 26 others
  • Width
  •   - 12.0m(Pedestrian road : 1.0m)
  • Constructed a total of 27 bridges
  •    and box structures
  • Yooshin’s first design-build
  •    structure project in Cambodia
    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Technical Advice for the Oakland Bay Bridge Project in the USA
    Client
    T.Y.Lin International
    Date
    Apr.2008~ Jun.2015
    Description
  • ​Bridge type
  •   - Self-anchored suspension bridge
  • Span size
  • Width
  • To replace the eastern bridge
  • areas collapsed during  the 1989 San Francisco  earthquake
  • Yooshin provided construction
  • technical advice based on detailed  design and supervision experiences  of the Youngjong 3-D suspension  construction project
    • 해외프로젝트 이미지
    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Detailed Design of the Cao Lahn Cable-stayed Bridge Construction Project in Vietnam
    Client
    PMU, Vietnam
    Date
    Nov.2011~ Sep.2012
    Description
  • ​Bridge type
  •   - 3-span concrete    - cable-stayed bridge
  • Span size
  • Width
  • Ordered by the Asian
  • Development Bank  and financially supported  by AusAid(Australia)
  • Riverbed bridge
  • main bridge(cable-stayed bridge)
  • approach bridge (super-T bridge)
  • earthwork section
  • Used locally available concrete
  • material for stiffening girder and  pylons
    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Design-Build Contract for Rehabilitation and Reconstruction of the Shirin Taghab ~ Andkhoy Section in Afghanistan
    Client
    Government of Afghanistan
    Date
    May. 2006~Jun. 2007
    Description
  • ​Total length
  • Design speed
  • Bridges
    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Design-Build Contract for Rehabilitation and Reconstruction of the Almar~ Shirin Taghab Section in Afghanistan
    Client
    Government of Afghanistan
    Date
    May 2006~Jun. 2007
    Description
  • ​Total length
  • Design speed
    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Detailed Design and Construction Supervision of the Vinh Thinh Bridge (Construction Project in Vietnam)
    Client
    Thang Long Project Management Unit
    Date
    Sep.2010~Sep.2014
    Description
  • ​Total length
  • Design speed
  • Bridges
    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Feasibility Study of the National Road No. 48 Improvement Project in Cambodia
    Client
    Korea EXIM Bank(EDCF)
    Date
    Oct. 2012~May. 2013
    Description
  • ​Total length
  • Design speed
  • Bridges
    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Detailed Design and Supervision of the Northern Mekong District Transportation Network Improvement in Vietnam (MPWT 2nd-phase)
    Client
    Ministry of Transport Project Management Unit No.1
    Date
    May. 2012~May. 2016
    Description
  • ​Total length
  • Design speed
  • Bridges
  •  

    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Detailed Design and Project Management Consultancy for National Road No. 3 and No. 48 in Cambodia
    Client
    KOICA
    Date
    Dec. 2011 ~ Jul. 2014
    Description
  • ​Total length
  • Design speed
  • Crossings 
    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Detailed Design and Construction Supervision of the Malagarasi Bridge and Associated Roads Project in Tanzania
    Client
    Hanil Construction
    Date
    Dec. 2010 ~ Oct.2014
    Description
  • ​Total length
  • Design speed
  • Bridges
  • Service area
  • Bus stations 
  •  

    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Detailed Design of the Northwest Local Road Improvement Project in Cambodia
    Client
    Ministry of Public Works and Transport
    Date
    Dec. 2010~Mar. 2014
    Description
  • ​Road improvement
  •  

    2.HARBOR

    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Detailed Design and Construction Supervision of the 3-berth Lamu Port Project in Kenya
    Client
    Kenya Ports Authority (KPA)
    Date
    Nvo.2013~ Nov.2018
    Description
  • n-berth
  •   - Container wharf 
      - general cargo wharf 
      - bulk cargo wharf 
  • Ship route and turning area
  •    dredging
  • Revetment
  • Buildings
  •   - Container wharf
      - general cargo wharf
      - bulk cargo wharf 
  • Ship repair facility
  • Social and environmental impact
  •    assessment
  • Construction supervision
    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Detailed Design of the BNPP Unit No. 1 and No. 2 Intake and Discharge Channel Construction Project in the UAE
    Client
    Korea Electric Power Corporation
    Date
    Jul.2010~ Feb. 2016
    Description
  • Breakwater
  •   - Intake channel 
      - Discharge channel
  • Dredging
  • Inclined wharf 
  • Mixing basin 
    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Detailed Design of the Banjul Port Improvement Project in Gambia
    Client
    AfDB
    Date
    Feb. 2008 ~ Oct. 2009
    Description
  • ​Terminal improvement 
  • Yard expansion 
  • Changed the existing oil terminals
  • Inclined wharf 
  • Social and environmental impact
  •    assessment

    3.RAILROAD

    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Feasibility Study of the Bình Hòa – Vung Tau Railway and 3 other Projects in Vietnam
    Client
    Ministry of Land, Transport and Maritime Affairs
    Date
    Dec. 2009~ Jul. 2010
    Description
  • ​Basic data survey
  • Analyzed economic and legal
  •    feasibility
  • Analyzed financial and project
  •    feasibility
    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Comprehensive Detailed Design of the Ben Thanh Central Station, Vietnam
    Client
    Nikken Sekkei
    Date
    Dec. 2012 ~ Mar. 2014
    Description
  • ​Stations(Ben Thanh crossing
  •    section)
  • Underground commercial facilities 
  • Developed ground and
  • underground spaces in line with the Ho Chi Minh City
  • Created a new underground
  • transportation network

    4.TRANSPORTING PLANNING

    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Feasibility Study of the 5 Asean County Railway Linkage Project (Thailand – Myanmar Section)
    Client
    KOICA
    Date
    Feb. 2005~Apr. 2007
    Description
  • ​​Length
  • Thailand  
  • -  Nam Tok-Three Pagoda Pass
  • Myanmar
  • - Three Pagoda Pass-Thanbyuzayat
    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Feasibility Study of the Vinh Thinh Bridge Construction Project in Vietnam
    Client
    Korea EXIM Bank
    Date
    Apr. 2008 ~Jul. 2008
    Description
  • ​​FS on the Vinh Thinh Bridge
  •    Construction Project
  • Length  (Son Tay Bypass
  •    section included)
  • Width 
  •   - Earthwork section  
      - Bridge section 
  • 7 bridges
  •   - Main bridge  
      - Auxiliary bridge 
  • Crossings 3 locations
    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Master Plan of the Arterial Road in Sumatra , Indonesia
    Client
    KOICA
    Date
    Jul. 2008 ~ Jul. 2010
    Description
  • To increase cultural and economic
  • exchanges and promote 
    the economic development across 
    Sumatra island by establishing 
    an efficient arterial road networ
    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Feasibility Study of the Turkmenbashi Port Modernization Project
    Client
    Ministry of Land, Infrastructure and Transport
    Date
    Dec. 2008 ~ Jun. 2009
    Description
  • ​​Traffic impact analysis
  • (traffic demand forecast and 
     capacity analysis)
    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Master Planning of the Artery Road Network in Myanmar
    Client
    KOICA
    Date
    Jul.2013~ Jul. 2015
    Description
  • ​Suggested future development
  •    directions
  • Provided an economic
  •    development locomotive by
       strengthening nationwide
       road network
  • Served as a role model for future
  •    similar projects
  • Technical transfer through training
  •    programs

    5.AIRPORT

    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Master Planning of the New International Airport Project in Nepal
    Client
    LMW.CO.,LTD.
    Date
    Apr. 2010 ~ Jan. 2011
    Description
  • ​Site creation 
  • Runway 
  • Taxiway
  • Passenger terminal 
  • Apron 
  • NAVAIDS 
    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Basic and Detailed Design of the AGIP WLGP Airport in Libya
    Client
    Daewoo E&C
    Date
    Mar. 2002 ~Sep. 2004
    Description
  • ​Runway 
  • Taxiway
  • Apron
  • Navaids
  •  

    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Feasibility Study of the JMMA AIRPORT Runway Expansion Project in Ethiopia
    Client
    International Contractors Association of Korea
    Date
    Aug.2006~Dec.2006
    Description
  • ​Runway
  • Taxiway
  • Apron
  • Passenger terminal 
  •  

    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Basic Design of the Jomo Kenyatta 2nd Runway and Taxiway Facility Construction Work in Kenya
    Client
    Kenya Airports Authority
    Date
    Aug. 2012 ~ Feb. 2013
    Description
  • ​Runway 
  • Parallel taxiway
  • Connection taxiway
  • Aeronautical lights andair navigation facilities
      - Airport operation level 
    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Detailed Design and Supervision of the Goatam Buddha Airport Improvement Project in Nepal
    Client
    Civil Aviation Authority of Nepal (CAAN)
    Date
    Aug. 2011 ~Aug. 2012
    Description
  • ​Runway
  • Parallel taxiway
  • Apron
  • Aeronautical lights and
  • air navigation facilities
      - Airport operation level 
    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Detailed Design and Construction Supervision of the COXBAZAR Airport Construction Project
    Client
    Civil Aviation Authority of Bangladesh (CAAB)
    Date
    Oct. 2010 ~ Feb. 2011
    Description
  • ​Runway re-pavement
  • Runway expansion
  • New apron
  • Earthwork filling
  • Cutting
  • Projection wall
  • Aeronautical lights 
  • Navigation system
  • Document work
    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Master Plan and Feasibility Study of the Siem Reap New International Airport in Cambodia
    Client
    NSRIA CO. LTD.
    Date
    Oct. 2006~Dec.2009
    Description
  • ​Site creation
  • Runway
  • Parallel taxiway
  • Rapid exit taxiway
  • Connection taxiway
  • Apron
  • NAVAIDS 
  • Utility facilities
  • AGL system
  • Power system
  • Aircraft fueling system
  •  

    6.TUNNEL

    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Detailed Design of the Xe PianㆍXe Namnoy Hydropower Plant Construction Project in Laos
    Client
    SK E&C
    Date
    Dec. 2012~Mar. 2014
    Description
  • ​Xe Pian Dam
  •   - Gravity concrete + 
         Central core rockfill dam
  • Xe Namnoy Dam
  •   - Central core rockfill dam

    7.WATER RESOURCES

    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Detailed Design and Supervision of the Mekong River Improvement Project in Laos
    Client
    MPWT in Laos
    Date
    May. 2008~Jun. 2013
    Description
  • ​To reduce man-made human loss
  • and flood damage by reinforcing the Mekong River dike
  • Location: Across the Mekong River
  • in Vientiane, Laos
  • Dike and revetment Riverside road
  • Riverside park Wharf improvement 
    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Feasibility Study of the Kamumu Multi-purpose Dam in Kenya
    Client
    MoEWNR in Kenya
    Date
    Apr. 2013~Dec. 2013
    Description
  • ​To ensure a stable water supply
  • for diverse purposes
  • To minimize flood damages
  • To prevent water pollution and
  • improve the riverside ecosystem
  • To improve agricultural production
  • level and local economic activities
    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Detailed Design and Construction Supervision of the Mongkol Borei Dam Construction Project in Cambodia
    Client
    MOWRAM, Cambodia
    Date
    Aug. 2011~Oct.2014
    Description
  • ​To ensure a stable water supply by
  •  establishing new damsand improvement existing ones 
  • Location south of  the Mongkol Borei Rive
    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Feasibility Study of the Guacerique II Dam ConstructionProject in Tegucigalpa, Honduras
    Client
    KOICA
    Date
    Dec. 2011~Jan. 2013
    Description
  • ​Basin area
  • Dam type
  •   - Concrete faced rockfill dam
  • Dam height and length
  • Total reservoir capacity
    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Feasibility Study of the Flood and Draught Control Project in Banteay Meanchey, Cambodia
    Client
    MOWRAM, Cambodia
    Date
    Jun. 2013~Dec.2013
    Description
  • ​Location: Banteay Meanchey,
  •    Cambodia
  • Water channel improvement
  •   - 71.3km
  • Installed crossing, distribution
  •    facilities and controlling gates

    8.URBAN PLANNING / SITE DEVELOPMENT DESIGN

    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Technical Consulting of the Yachay Knowledge-based City Development Project in Ecuador
    Client
    INP (National Institutes of Pre-investment)
    Date
    May 2012 ~ Mar. 2014
    Description
  • ​Established the new town
  •    (4,600ha) development concepts
  • Established a wide-area
  •    transportation planning targeted
       the new town and Quito
  • Set up a knowledge-based
  •    new town development plan
  • Set up Master Plans
  •    for Priority Project Areas
  • Set up a successful
  •    marketing strategy
  • Conducted a study on
  •    a new town university model

    9.LEISURE RECEATION & LANDSCAPE

    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Detailed Design of the Al Jabal Al Gharbi University (Nalut Campus) in Libya
    Client
    Cosmo D&I
    Date
    Feb.2010~ Feb.2015
    Description
  • ​Landscape design of the Nalut
  • Campus(excluding the playground and housing sections)
  • Campus area
  • Landscape pavement area
  • Green area
  • Basic design(BDP, UK) review
  • Planting foundation design
  • Waterfront facility design
  • Landscape lighting facility ​
  • 10.ENVIRONMENT PLANT

    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Steel Liner Design of the Golen Gol Hydropower Project in Pakistan
    Client
    Sambu Construction
    Date
    Jan. 2013~ Apr. 2013
    Description
  • ​Steel liners
  • inside pressure tunnel
  • pressure shaft
  • surge chamber
  • inlet valve
  • headrace tunnel
  • 11.WATER SUPPLY & SEWERAGE

    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Master Planning of the Environment Improvement in Myanmar
    Client
    Korea Environmental Industry, Technology Institute
    Date
    Mar. 2013 ~ Apr. 2014
    Description
  • ​Improved environmental policies
  •    and institutions
  • Opened environmental
  •    cooperation seminars
  • Provided an local engineer
  •    invitation training
    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Feasibility Study and Basic Design of the Waterwork System Construction Work in Bandung, Indonesia
    Client
    KOICA
    Date
    Dec. 2012 ~ Aug. 2014
    Description
  • ​Established an intergraded system
  • operation and control measure
  • Reviewed design efficiency of new
  • dam sites and connection tunnels
  • Provided FS and detailed design
  • service for the water pipeline
       installation project 
    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Detailed Design for Water Supply and Sanitation System in Kurdakhani Absheron Peninsula
    Client
    KOICA
    Date
    Dec. 2011~ May. 2013
    Description
  • ​Water pipelines
  • Dirty water pipelines
  • Manhole pumps
    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Basic and Detailed Design of the Southern Thu Thiem New Town Infrastructure Creation Project
    Client
    VIDIFI, DQME
    Date
    Aug. 2011~ Mar. 2014
    Description
  • ​Rain water pipelines
  • Dirty water pipelines
  • Water pipelines & technical trench
  • Power lines
  • Communication lines
  • Garbage collection system
    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Detailed Design and Construction Supervision of the Sewage Water Treatment Plant in Siem Reap, Cambodia
    Client
    Ministry of Public Works and Transport, Cambodia
    Date
    Jun.2010~ Jun.2014
    Description
  • ​Sewage water treatment plant
  • Relay pumping stations
  • Dirty water pipelines
  • Rain water pipelines
  • River improvement

    12.SUPERVISION

    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Construction Supervision of the Vinh City Development Project in Vietnam
    Client
    Project Management Unit of PPTAF
    Date
    Nov.2013~ Nov.2018
    Description
  • ​Design review
  • Construction supervision
    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Construction Supervision of the Hanoi Ring Road 2 Construction Project in Vietnam
    Client
    PMU
    Date
    May.2012~ Aug.2014
    Description
  • ​Nhat Tan~Xuan La
  • Xuan~LaBuoi
  • Cau Giay Interchange
  • Buoi Interchange
  • Buoi~Cay Giay
    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Feasibility Study of the BG Kha Dam Construction Project in Nepal
    Client
    Ministry of Land, Infrastructure and Transport
    Date
    Jan.2013~ Jan.2014
    Description
  • ​Studied relevant data and standards
  • Surveyed detailed design standard and specifications
  • Investigated other engineering projects being implemented in nearby areas
  • Surveyed upper stream conditions of the dam site
  • Reviewed water supply demand
  • Checked main structure functional performances
    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Construction of the Ho Chi Minh –Long Tanh -Dau Giay Expressway Project in Vietnam
    Client
    Vietnam Expressway Corporation
    Date
    Jul.2010~ Jul.2013
    Description
  • ​Total length
  • Design speed
  • Long-span bridge crossing the Dong Nai River
  • Short/mid-span bridges
  • Elevated road
  • Toll gates
  • Graded crossings
    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Local Transportation System Improvement Project in Bangladesh (2nd Phase, MSC)
    Client
    Local Govt Engineering Div (LGED)
    Date
    Jul.2013~ Sep.2017
    Description
  • ​UZR road improvement
  • UNR road improvement 
  • Reinforcement and maintenance
  • Maintenance work for functional
    • 해외프로젝트 이미지

    Click the image to see the original size.

    Project
    Construction Supervision of the UVA Local Road Construction Project in Sri Lanka
    Client
    MLGPC in Sri Lanka
    Date
    Sep.2010~Sep.2014
    Description
  • ​Total length
  • Road expansion and improvement
  • UVA1 Length 
  • UVA2 Length
  • UVA3 Length
  • UVA4 Length
  • UVA5 Length